The equipment hoisting should take off and land steadily without any impact.
The installation of the tower equipment is required to be stable and firm, and the tower body must be vertical. In areas with strong wind, the tower body should be strengthened.
The piping connected with the equipment should avoid all its weight from acting on the connection of the equipment, and the outlet connection of the tower top should be fixed.
It is recommended to install a compensator for the connection of the pipe and the pipeline.
When driving, start the absorption liquid pump first, turn on the fan, and enter the system after normal operation.
When the system is running, the flow rate of the water pump should be adjusted to prevent the use effect from being too large or too small.
Pay attention to the water level at the bottom of the tower to prevent liquid from entering the air duct.
Prevent debris from entering the tower to block channels and pipelines.
If the medium is sticky or the sediment is attached to the tower equipment, which will reduce the treatment effect, the flange can be disassembled to clean the blades.
Hot ProductsMore+
If you have any need about our steel products, Please send email to [email protected] or leave a message to use this function. we will reply you ASAP!